Sale!

Watson Overtime Impact Gloves – Medium Spandex Black/orange With Reinforced Palm

Original price was: $39.99.Current price is: $11.99.

SKU: SK0119398-US20260702-163005 Category: Tag:

Description

Introducing the Watson Overtime Impact Gloves in a striking blackorange palette, engineered for mediumsize hands. Crafted from flexible spandex, these gloves deliver a snug, secondskin fit while maintaining durability for demanding tasks. The reinforced palm and thumb patch provide extra wear resistance where you need it most, and a secure hookandloop cuff keeps the glove firmly in place. A builtin knuckle strap adds essential protection without sacrificing freedom of movement.

Benefits: Designed for professionals who require reliable hand protection, these gloves offer a hightraction, nonslip grip that enhances control on tools and machinery. The impactabsorbing knuckle strap reduces strain during repetitive motions, helping you stay comfortable during long shifts. With a lightweight spandex construction, youll experience reduced hand fatigue while still benefiting from robust reinforcement.

Key Features & Benefits:

    Spandex Flex Fit: Stretchable fabric conforms to the hand for a comfortable, ergonomic fit, ideal for mediumsize users.

    Reinforced Palm & Thumb Patch: Extradurable stitching protects highwear areas, extending glove life during heavyduty work.

    Knuckle Strap Protection: Integrated impact guard shields knuckles from bumps and vibrations, boosting safety on the job.

    NonSlip Grip Surface: Textured palm delivers reliable traction on wet or oily surfaces, improving tool handling.

    HookandLoop Cuff Closure: Adjustable strap ensures a secure seal around the wrist, preventing debris entry.

Why Choose Watson Overtime Gloves: Experience the confidence that comes with premium hand protection, whether youre working in automotive repair, construction, or any highimpact environment. The Watson Overtime Impact Gloves combine durability, comfort, and safety in a vibrant design that stands out on the job site. Trust in a glove that delivers consistent performance shift after shift, keeping your hands secure and agile.

SKU: 7038620

UPC: 065537854779

Weight: 0.34

Package Width: 4.6

Package Length: 1.85

Package Height: 11.35

Model Number: 025-M

Brand: WATSON GLOVES

Manufacturer Name: JOHN WATSON LTD

Reviews

There are no reviews yet.

Be the first to review “Watson Overtime Impact Gloves – Medium Spandex Black/orange With Reinforced Palm”

Your email address will not be published. Required fields are marked *

TOP